Hello Everyone, Lots and lots of work has been done on the tiny house in the past few weekends. It seems like I have no life anymore besides build the tiny house haha!! I have run the copper LPG pipe, electrical and hot and cold water pipes. The kitchen cabinets have been installed and the laminate flooring underneath. The kitchen area has been completely insulated and ready for interior wall boards. I also started to build the utilities cabinet on the outside of the house, which will hold the water heater, solar controller/inverter, battery bank, etc..  A retractable awning has been installed above the door for when we install the fold up deck.

IMG_1752 IMG_1751

IMG_1750 IMG_1749 IMG_1748 IMG_1747 IMG_1746 IMG_1745 IMG_1744 IMG_1743 IMG_1742 IMG_1741 IMG_1740 IMG_1739 IMG_1738 IMG_1737 IMG_1736 IMG_1735 IMG_1734 IMG_1733

We bought this old cabinet unit on auction for 80 dollars. It will look nice all repainted.

IMG_1732 IMG_1731  IMG_1729 IMG_1728 IMG_1727 IMG_1726 IMG_1725 IMG_1724 IMG_1723

8 Comments